Case Study · Metal Fabrication · Gulf Coast Louisiana

Quoting With Confidence: How a Coded Fabrication Shop Built a True Labor Rate and Grew Into New Markets

Harrow Metal Works wanted to know exactly which jobs made money and what its shop hour really cost. Building that answer gave the business the confidence to price its capability — and it grew.

Read the 5-minute summary →

Company
Harrow Metal Works
Location
Gulf Coast Louisiana
Shop
ASME-coded fabrication and construction
Engagement
Fractional CFO
Focus
Burdened labor rate, bidding, 13-week cash, diversification

The short answer

Harrow Metal Works, an ASME-coded fabricator on the Gulf Coast, used the post-COVID oil and gas slowdown as the moment to sharpen its costing. Material costs were already tracked accurately against each job; the opportunity was in labor burden and overhead — including the cost of maintaining ASME, ABS, DNV, and AISC certifications — which needed to be fully reflected in the rate as the shop's capability had grown. Accounovation rebuilt the rate from historical financials and forward growth expectations, retrained leadership on how labor and overhead behave, restructured the bidding process by work type, and implemented a rolling 13-week cash flow forecast so milestone-billed projects could stay cash-flow positive without drawing on the line of credit. We also advised Harrow Metal Works to diversify beyond oil and gas so no single industry would set the company's pace — a move the accurate labor rate made possible, because entering a new market means pricing work without years of history to lean on.

Raising prices in a softer market is one of the most common concerns in manufacturing. The data gave Harrow Metal Works the confidence to move forward: the customer mix shifted toward buyers who valued capability and reliability over the cheapest quote, and the business grew.

Key Takeaways for Fabricators

  • Accurate material costing is only half the picture. If you buy steel against a job, materials are precise — the bigger opportunity is usually in labor and overhead.
  • Certifications are overhead. Code and classification-society compliance costs real money in procedure qualification, QA staffing, third-party inspection, and documentation. That cost has to be recovered through billable hours.
  • Rates by work type reveal true job margins. A pressure vessel, a structural package, and a modular skid do not carry the same labor and inspection content.
  • Pricing gaps hide inside the quote. They show up as thinner margins rather than cost overruns, so they're easy to mistake for market conditions.
  • Milestone structure is a financing decision, not a contract detail. Negotiate it during the bid, using the project's cash curve.
  • Diversification is a financial strategy as much as a sales one. Accurate rates are what let you price confidently in a new market.
  • The rate depends on a volume forecast, not just history. Overhead divided by last year's hours misprices a shop that intends to grow.
  • Pricing with confidence grew the business. The customer mix shifted toward long-term partners who valued capability over price.

Who is Harrow Metal Works?

Harrow Metal Works is a custom metal fabrication and construction company on the Gulf Coast of Louisiana. It operates an enclosed, ASME-coded shop and holds the code certifications and third-party approvals that open larger industrial and marine work.

Its work spans ASME pressure vessels, modular skid packages, heat exchangers, water treatment and filtration packages, facility piping and structural fabrication. The shop carries significant welding, rolling, pipe-handling and overhead-lifting capacity.

In other words: a capital-intensive, code-driven, highly certified operation. That profile matters, because it's exactly why accurate costing is so valuable for a shop like this.

Why does every fabricator need job-level profitability?

Like many fabricators in the region, Harrow Metal Works had grown on oil and gas demand. When that activity slowed after COVID, revenue softened, cash tightened and the line of credit carried a higher balance.

It's a familiar pattern across project-based manufacturing. At high volume, a busy shop feels healthy, and the strong jobs carry the average. When volume shifts, a shop needs to know precisely which jobs earn the most and why — so they can pursue the right work at the right price.

Harrow Metal Works's leadership chose to use the slowdown to get that answer.

What did the true labor rate show?

The analysis started with a distinction that turns out to be decisive in fabrication: material cost and labor cost are not equally trustworthy.

Harrow Metal Works purchases material against specific projects. Steel, plate, fittings, and consumables tie back to a job number cleanly, so material costing was genuinely accurate. Every project showed what went into it.

Labor and overhead were where the opportunity sat. When we rebuilt the shop's rate from historical financials — capturing the full burden of labor plus the overhead the business actually carried — the real cost per shop hour came in meaningfully higher than the rate being quoted.

The shop's capability had grown. Now its pricing could grow with it.

What belongs in a fabrication shop's burdened labor rate?

A burdened shop rate is not a wage. It's the fully loaded cost of putting one productive hour of shop capacity in front of a customer's job. For a coded shop, that includes:

  • Direct wages for shop personnel — welders, fitters, machinists, helpers.
  • Payroll burden — payroll taxes, workers' compensation (significant in fabrication), health benefits, paid time off, and overtime premium patterns.
  • Non-productive paid time — training, certification and re-qualification time, safety meetings, cleanup, setup and teardown, and idle time between jobs.
  • Quality and compliance cost — QA/QC personnel, welding procedure qualification and welder continuity, third-party and authorized inspector time, NDE and radiography coordination, hydrotesting, material test report traceability, and code documentation packages.
  • Equipment cost — depreciation, maintenance, and consumables across the welding fleet, cranes, rollers and pipe-handling equipment.
  • Facility and yard cost — the shop, the acreage, utilities, insurance, and property cost.
  • Supervision and general overhead — project management, drafting and design, estimating, purchasing, and administration.

Two things on that list most often move the rate, and both applied at Harrow Metal Works.

First, certification cost. Holding ASME and classification-society credentials isn't a one-time expense — it's a permanent operating cost. Procedures have to be qualified and maintained. Welders have to stay continuous. Inspection hold points consume calendar time and shop time. Documentation packages take hours that nobody logs as "welding." When a shop earns credentials that open bigger markets, its cost per hour rises. Updating the bid rate to match lets the shop earn what its credentials are worth.

Second, equipment growth. Capacity gets added incrementally — a machine here, a crane upgrade there. Each addition raises the overhead that must be absorbed by billable hours. Rates, meanwhile, tend to get set once and then adjusted by feel or by what competitors seem to be charging.

Should a labor rate be based on historical or projected volume?

Both — and getting this right is what makes a rate dependable.

A burdened rate is a fraction: the overhead and labor cost you expect to carry, divided by the productive hours you expect to sell. The numerator comes from your history. The denominator is a forecast.

Use last year's hours as the denominator in a business that intends to grow, and the rate comes out too high — you'll price yourself out of work you could have won profitably. Use optimistic hours you don't hit, and the rate comes out too low, and you under-recover overhead on every job. Neither error is visible until the year closes.

For Harrow Metal Works we built the rate from historical financials and the company's forward growth expectations, so the denominator reflected the shop the business was becoming rather than the one it had been. That also makes the rate maintainable: when the growth assumption changes, leadership knows exactly which input to revisit.

Why pricing gaps are hard to see

A cost overrun is visible. It shows up as a variance against an estimate, and someone asks about it.

Underpricing produces no variance. The job runs exactly as estimated — it's the estimate that was wrong. Margin simply arrives thinner than expected, on every job, consistently. Aggregate that across a year and it reads as a market condition rather than a repeatable, fixable pricing error.

That's why the answer has to come from the rate itself. Harrow Metal Works was executing well — the opportunity was to price that execution at its true value.

How can milestone billing fund a project?

Alongside pricing sat a second opportunity: timing.

Harrow Metal Works's larger work — modular skid packages, turnkey systems, multi-stage fabrication and construction scopes — bills on milestones. Material for those jobs is bought up front. Shop labor accumulates for weeks. Cash arrives only when a milestone is certified and invoiced.

The gap between outlay and inflow has to be funded by somebody. In Harrow Metal Works's case, it was funded by Harrow Metal Works: steel and payroll went out the door, drawn against the line of credit, and the customer's payment came later. The company was, in practical terms, providing working capital to its customers' projects at its own borrowing cost.

This is one of the most common cash challenges in project-based manufacturing — and one of the most solvable. It has nothing to do with profitability. Even a highly profitable job needs its cash timing designed.

What is a 13-week cash flow forecast?

A 13-week cash flow forecast is a rolling, week-by-week projection of cash receipts and cash disbursements across one quarter. It tracks actual expected timing — payroll dates, material purchases, milestone billings, collections, debt service, tax payments — rather than accrual-based revenue and expense.

Thirteen weeks is the standard window because it's long enough to see a full billing and collection cycle coming and short enough that the estimates remain credible. For a fabricator with milestone contracts and a revolving line of credit, it converts cash from something you discover to something you plan.

What did Accounovation actually do?

1. Rebuilt the financial model from actual history — and forward growth

We reconstructed the financial picture from historical performance rather than from assumptions, establishing from evidence what the business truly cost to run. Then we extended it forward, incorporating where the company expected to grow.

Both halves were necessary. History tells you what an hour costs. The growth outlook tells you how many hours you'll have to spread that cost across — and a rate built on last year's volume misprices a shop that intends to expand. Every recommendation that followed traces back to that model.

2. Established the true burdened labor rate — and retrained leadership on how to think about labor and overhead

This was the turning point of the engagement, and the training mattered as much as the number. We walked leadership through how the rate is constructed, what belongs in it, and why the cost of being a coded, capital-intensive shop has to be recovered through billable hours instead of treated as a cost of doing business that somehow covers itself.

A rate you're handed expires the moment your costs change. A rate you understand, you can rebuild yourself — and you can defend it in a negotiation, because you know exactly what's underneath it.

3. Rebuilt the bidding process around the true rate

An ASME pressure vessel does not carry the same labor content, inspection burden, or documentation load as a structural steel package or a skid assembly. Estimating each type of work at its own rate shows exactly what each job earns.

With accurate rates in place, bidding became a calculation with known margin rather than a guess anchored to competitor pricing. Work that doesn't fit is identified before the quote leaves the building.

4. Implemented a rolling 13-week cash flow model

We built the forecast around Harrow Metal Works's real payment behavior: milestone billing dates, material lead times and deposits, payroll cycles, and line-of-credit activity. Leadership now sees its cash position several weeks out — early enough to accelerate a milestone, time a material buy differently, or stage a purchase.

5. Made milestone structure a bidding decision instead of a contract afterthought

We trained leadership to map a project's cash curve during estimating, then to negotiate milestones that keep the job cash-flow positive from start to finish. Mobilization and material deposits get positioned against the front-loaded spend; progress milestones get placed against the labor build.

The shift is from "what payment terms will the customer accept?" to "what payment structure does this project require in order to fund itself?" Those are different questions with different answers.

6. Treated industry concentration as a financial risk to be managed

The pricing and cash work strengthened how Harrow Metal Works earns money. The next step was building resilience.

Oil and gas is a cyclical market, and a shop concentrated in it inherits that cycle. So we advised Harrow Metal Works to deliberately diversify its end markets — to build a book of business where no single industry sets the company's pace.

That's a financial recommendation, not just a sales one. Concentration is a risk that belongs on the same page as the debt schedule and the cash forecast, because it determines how much of a shock the balance sheet has to be able to absorb.

Pricing with confidence

Everything above can be modeled, checked and documented. Acting on it takes a different kind of confidence.

An accurate rate usually means charging more, and raising prices in a softer market is one of the most common concerns across manufacturing. It deserves a real answer rather than reassurance. The data provided one.

Here's what happened.

The customer mix got stronger

A few price-driven accounts moved on — buyers who treated fabrication as a commodity and ran every job back to the cheapest quote. That freed shop capacity for more valuable work and lifted the average margin across the book.

And new customers valued what Harrow Metal Works does best

The work that replaced it came from buyers evaluating Harrow Metal Works on capability, code compliance, schedule reliability, and engineering support — the things a certified shop with 200,000 pounds of crane capacity and in-house design is genuinely good at. Those customers weren't shopping for the lowest number. They were looking for a fabricator they could rely on across many projects.

That shift changes the character of a business. A shop competing on price has to re-win every job on the same terms. A shop competing on capability accumulates relationships, and pricing conversations get easier rather than harder over time.

Accurate pricing didn't shrink the business. It focused it — and it grew.

The lesson for any manufacturer weighing the same decision: the customers who value your capability are the ones who stay, and pricing at your true cost gives you the capacity to serve them well.

Why accurate costing made diversification possible

Diversifying takes more than a sales plan — it takes confident pricing.

To bid work in an unfamiliar industry, you have to price it. Pricing it requires knowing what an hour in your shop actually costs, because you have no historical intuition to fall back on. In oil and gas, Harrow Metal Works had years of pattern recognition. In water treatment or food and beverage, the rate is what guides every quote.

So the sequence mattered. Building the true rate first is what turned diversification into a confident, profitable decision.

The same logic applies on the cash side. New industries bring unfamiliar payment behavior and different milestone conventions. A shop that can model a project's cash curve can evaluate those terms on their merits.

What changed for Harrow Metal Works?

Harrow Metal Works now bids from a rate it can stand behind, with margin engineered into the quote rather than hoped for at the end. Profitability is visible at the job level, so leadership can steer every job while there's time to act. Milestones are structured so projects fund themselves rather than drawing down the line of credit.

And the business is far more diversified. Harrow Metal Works today serves water treatment, maritime, utilities, renewable energy, food and beverage, and agriculture alongside oil and gas. A slowdown in any one of those markets is now a soft quarter — a stronger business to own, to lend to, and to plan around.

The capability also stayed in the building. Leadership understands the labor rate, the overhead structure, and the cash position, and can work all three without us in the room. That was always the objective.

Could your shop benefit from the same approach?

A few signals worth checking against your own numbers:

  • You can name your material cost on a job to the dollar, but you'd have to estimate your labor cost.
  • Your shop rate hasn't been rebuilt since the last time you added significant equipment or earned a new certification.
  • You bid different work types — vessels, structural, skids, piping — off the same hourly assumption.
  • Your gross margin is consistently a few points below what your estimates assumed, and you attribute it to "the market."
  • Your line of credit has a balance that never really goes to zero.
  • You've never mapped what a project's cash position looks like week by week before signing it.
  • One cyclical industry accounts for most of your revenue, and your plan for a downturn is to wait it out.
  • You suspect your prices are below what your work is worth, and you'd like real numbers before deciding.

Any one of those is worth a look. Three or more, and the biggest opportunity is very likely in your labor rate.

Frequently asked questions

Why do fabrication shops underestimate their labor rate?

Because the rate is usually set once and then adjusted by feel, while the underlying cost structure keeps changing. Equipment gets added, certifications get earned, insurance and workers' compensation costs rise, and non-productive paid time grows — but the bid rate stays anchored to a number that made sense years earlier. Competitive pressure reinforces the problem: shops benchmark against what rivals appear to charge rather than against what their own hour actually costs.

How is a burdened labor rate different from a wage rate?

A wage rate is what you pay an employee per hour. A burdened labor rate is the fully loaded cost of delivering one productive shop hour, including payroll taxes and workers' compensation, benefits, non-productive paid time, quality and compliance cost, equipment depreciation and maintenance, facility cost, and supervision. In fabrication, the burdened rate is commonly two to three times the wage rate — and the multiple varies by shop, which is exactly why a rate borrowed from an industry benchmark isn't safe to bid with.

Does maintaining ASME or classification-society certification really affect profitability?

Yes — and it should. Certification opens access to higher-value work, but it also raises the cost of every hour the shop sells: welding procedure qualification and welder continuity, QA/QC staffing, authorized inspector coordination, NDE and hydrotesting, material traceability, and code documentation packages. A certified shop that bids at an uncertified shop's rate is giving away the margin its credentials earned.

Why should a fabricator use a 13-week cash flow forecast instead of the P&L?

The P&L tells you whether the work was profitable. It doesn't tell you whether you'll be able to make payroll in week six. In project-based fabrication, profit and cash separate sharply: material is purchased up front, labor accrues over weeks, and milestone payments land later. A 13-week forecast tracks the actual timing of cash in and cash out, which is what determines whether you draw on the line of credit.

How should milestone payments be structured on a fabrication project?

Work backward from the project's cash curve. Identify when material has to be purchased and when labor accumulates, then position milestones so cash arrives at or before each major outlay — typically a mobilization or material deposit at award, progress milestones tied to verifiable fabrication stages, and a modest retainage at completion. The goal is a project that never goes cash-negative. If the resulting structure is one the customer won't accept, that's pricing information: the cost of carrying the project belongs in the bid.

Will raising my prices cost me customers?

A few price-driven accounts may move on — and that usually frees capacity for better work. If your price was below your true cost, those accounts weren't contributing margin. At Harrow Metal Works, the business grew: the customers who stayed and the ones who arrived evaluated the shop on capability, code compliance and reliability. The goal is a customer base that values what you do best.

What if my competitors bid below my true cost?

Then either their cost structure is genuinely different from yours, or they don't know their cost either — and in fabrication it's frequently the latter. Matching a price you can't sustain isn't competing; it's transferring your margin to the customer. The durable response is to compete on what a certified, well-equipped shop can actually offer — engineering support, code compliance, schedule reliability, single-source capability — and to let the work that only ever goes to the lowest number go somewhere else. You can't win a race to the bottom; you can only finish it.

Should a shop labor rate be based on historical or projected volume?

Both. The rate is your expected overhead and labor cost divided by the productive hours you expect to sell — the numerator comes from history, the denominator is a forecast. Using last year's hours in a growing business produces a rate that's too high and costs you winnable work; using hours you never hit produces a rate that's too low and under-recovers overhead on every job. Build it from historical financials and your forward growth expectations, and revisit it when the growth assumption changes.

How much industry concentration is too much for a fabrication shop?

There's no universal threshold, but the useful test isn't a percentage — it's a stress test. Ask what happens to cash, covenant compliance, and headcount if your largest end market contracts by 30 to 40 percent for four consecutive quarters. If the honest answer is that the business doesn't survive it, you are concentrated regardless of what the percentage says. Shops serving cyclical sectors like oil and gas should treat concentration as a standing item in financial planning, not something to revisit after a downturn starts.

Should a fabricator diversify into new industries during a downturn?

Only with accurate rates in hand. A downturn creates the urgency to diversify and simultaneously the worst conditions for doing it badly — margins are already thin, and you're bidding into markets where you have no cost intuition to catch a bad quote. Establish your true burdened rate first, then pursue new markets. Diversifying on a broken pricing model spreads the problem instead of solving it.

Why is customer and industry concentration a CFO issue rather than a sales issue?

Because concentration determines how large a shock your balance sheet has to be able to absorb, which in turn drives how much liquidity you need, how much leverage is prudent, and how a lender views you. Sales decides which markets to pursue; the financial function should be the one quantifying what the current mix costs you in risk. It belongs on the same page as the debt schedule and the cash forecast.

Can't my CPA do this?

A CPA firm is generally engaged to prepare and file — historical, compliance-oriented work. Accounovation is not a CPA firm. Fractional CFO work is forward-looking: building the model, setting the rates, structuring the bid process, forecasting cash, and training your team to run all of it. Both matter; they answer different questions.

How long does it take to see results from rebuilding a labor rate?

The corrected rate itself can be established in weeks, because the inputs already exist in your historical financials. The margin improvement follows your bid-to-award cycle: new bids go out at the corrected rate, and the effect shows up as those jobs enter the shop and close. Cash flow visibility, by contrast, improves almost immediately — a 13-week forecast starts informing decisions the week it's built.

What size manufacturer does Accounovation work with?

Accounovation provides outsourced accounting and fractional CFO services to small and mid-sized manufacturers — typically owner-led businesses that have outgrown bookkeeping-only support but aren't ready for a full-time CFO. We've worked with more than 200 manufacturing business leaders and delivered over 8,000 hours of fractional CFO services.

The bottom line

Every time you add equipment or earn a certification, your true cost per shop hour changes. Rebuilding your labor rate to match keeps your pricing aligned with the value you deliver.

If your materials tie neatly to projects but your margins still don't make sense, the answer is almost always in labor and overhead. And it's almost always in the bid, not on the shop floor.

An accurate rate is also the foundation for resilience. With confident pricing, you can diversify across industries so that a slowdown in any one market is simply a soft quarter.

And if you're unsure whether to raise prices, let the data decide. The customers who value your capability are the ones who stay.

Some client names and identifying details have been changed at the client’s request. Results are unchanged.

More case studies

Do you know which of your jobs make the most money?

Accounovation provides outsourced accounting and fractional CFO services built for manufacturers. We help you turn your numbers into clearer margins, cash flow, and profitable growth — and we teach you to run the numbers yourself.

Book a free call